Enhancements made, thus far, to ‘Unit Dashboard’ widget (to v9.9.4.217)

On Tuesday 30th July 2024 we built-and-released version 9.9.4.217 as (what’s currently, as I type this note) the ‘Latest and Greatest’ version available for download and install here.

This version contains a number of enhancements to the ‘Unit Dashboard’ widget* that we’d like to describe in this Release Note – at least in part because we’ll be contacting some of our clients directly about these particular enhancements, with some questions as well.

* many other widgets have also been enhanced, but this Release Note only highlights what we have done on only this particular widget.

The enhancements we’ve been focused on in ez2view have included, but not been restricted to, consideration of these ‘Known Limitations with the ‘Transition Release of ez2view on 27th May 2024’.

 

(A)  Enhancements Delivered

Amongst the enhancements to this widget already delivered, we’d like to highlight the following three enhancements:

 

Enhancement #A1)  Conformance Obligation, and Conformance Status

The implementation of the IESS Rule was material to many of our ez2view clients … and hence to us.

1)  One of the major elements of that change was the commencement of Aggregated Dispatch Conformance from 9th August 2023 as an option for Registered Participants.

2)  Now that Bi-Directional Units have been enabled (from Monday 3rd June 2024) and are progressively transitioning (with the first being Wandoan BESS on Tue 16th July 2024) we have upgraded this widget to help users make sense of both.

These changes have resulted in their being a significant number of permutations of what we are terming ‘Conformance Obligation’

1)   which a NEM stakeholder might think of as ‘do I care about what my Target is?’

2)  For which reason we’ve updated this ‘Complex Market Concepts’ page about Conformance.

Then, depending on the unit’s Conformance Obligation, calculate a ‘Conformance Status’ according to the following logic:

Step 1 = if the user’s copy of ez2view is pointed at a Private EMMS, then:

1a)  If that Private EMMS has private data (for the DUID in focus) then use the data in the DISPATCH_UNIT_CONFORMANCE table.  Note that this will work either:

i.  In Real Time
ii.  Next Day

1b)  If that Private EMMS does not have private data (for the DUID in focus) then do the same as in Step 2.

Step 2 = if the user’s copy of ez2view is pointed at a Public EMMS (i.e. one with only ‘public’ data), then:

2a)  In Real Time (or within the current Market Day) there’s nothing that can be done, so fields are blank.

2b)  Time-Travelled back to the prior Market Day (or further back in time), then use our codification of our interpretation of the Appendix A of the AEMO ‘Dispatch Procedure’ (SO_OP_3705 as at 3rd June 2024)

Here’s a few examples we’ve collated of this logic in action (with DUID and Dispatch Interval not included):

Example 1 … here’s a Semi-Scheduled unit:

Example 2 … here’s a different Semi-Scheduled unit:

Example 3 … here’s a Scheduled unit:

Example 4 … here’s a different Scheduled unit:

You’ll see more permutations of these fields after you’ve upgraded to this ‘Latest & Greatest’.

 

Enhancement #A2)  Ramp Rates

There have also been several enhancements made with respect to Ramp Rates for the unit.  In making these enhancements, we have been conscious of a number of factors, including the following:

Consideration #1)  On occasions, the ramp rates offered in the bid are overwritten by data supplied from the SCADA system:

(a)  This requirement was previously identified to us by a client (GR Case 6092)

(b)  This requirement has now been taken into effect.

Consideration #2)  With the advent of BDUs, there have been several added complications:

(a)  The direction of ‘up’ and ‘down’ in ramping is no longer as simple as it used to be; and

(b)  BDUs have four ramp rates that might be relevant (e.g. when flipping from charge to discharge during a single dispatch interval, or vice-versa).

To cater for these, we have implemented logic that (instead of listing particular ramp rates, and having ambiguity about these) we show on the screen for each dispatch interval:

1)  the bounds of possible Power (i.e. output/input), with some consideration given to both:

(a)  The capacity of the unit; and

(b)  The availability of the unit.

(c)  The ramp rates for the unit

(b)  But notably (and deliberately, at least at this point) not other factors that might limit the unit capability

2)  the actual Target (in between the two possible bounds)

This is augmented by more information in tool-tip on mouse-over.

Example 1 … here’s a unit dispatched to its full capacity:

Example 2 … here’s a different unit dispatched ‘down’ to 0MW in the second DI:

Example 3 … here’s a BDU:

Given the complexity in this upgrade, we’d particularly like to hear your feedback?

 

Enhancement #A3)  Widget Guide Updated

In conjunction with (and to explain in more detail) what we have done thus far, the v9.9.* Widget Guide for this widget has been updated.

 

 

(B)  Enhancements still to come …

There are a number of things we still have on our list of ‘Things to do’ with respect to this widget … and your feedback is always welcome!

… remember to click the ‘Feedback’ button that’s top right of the widget to give us your feedback:

In particular, we’d like to highlight the following…

 

Future Enhancement #B1)  new data from AEMO for Semi-Scheduled units

Shortly, the AEMO plans to commence publication of additional data for Semi-Scheduled units – there’s more detail about ‘Publishing actual intermittent generators (SCADA) availability data’ from AEMO.

Our plan is as follows:

Step 1 = (as soon as the new data becomes available) to inspect and confirm that it meets our expectations;

Step 2 = during a period of inspection (during which we’d like to speak with some clients … so let us know if you have a particular interest in this?) confirm ideas we have loosely sketched up for how to incorporate in various widgets, including this ‘Unit Dashboard’

Step 3 = then implement and release.

There will be another communication with customers when this has been completed

 

Future Enhancement #B2)  ‘why was the Target what it was?’

There are additional enhancements we have identified to help users understand more clearly why a DUID’s Target was what it was.